Electric Service Standards & Requirements
Revised June 2006 Residential and Business
Information for use by Contents
101 Purpose
102 Change in Requirements 103 Chugach Service Area 104 Codes and Ordinances 105 Membership 106 Disconnection 107 Complaints
201 Character of Service
202 Types of Service 203 Application for Service 204 Application for Line Extension 205 Electric Service Extensions to Permanent Facilities 206 Electric Service Extensions to Temporary Facilities 207 Easements 208 Customer Facilities 209 Service Conductor Connection 210 Service Facilities on Customer's Premises 211 Undesirable Service Characteristics 212 Electric Generators 213 Load Centers 214 Work Requirements in Proximity to Chugach Facilities 215 Modifications to Services and/or Facilities
301 Scope
302 Metering and Service Equipment Location 303 Metering and Service Equipment General Requirements 304 Grounding and Bonding Requirements 305 Sealing and Locking Requirements 306 Service and Meter Disconnect Requirements 307 Self-Contained Metering Requirements 308 Multiple Metering Requirements 309 CT Rated Metering Requirements 310 Switchboard Service Equipment Requirements 311 High Voltage (Primary) Metering 312 Load Control and Pulse Metering 313 Meter Testing 314 Fire Pump and Fire Pump Equipment 315 Unusual Conditions
401 General Information
402 Electric Service Inspection Requirements 403 How and When To Call For Inspection
SS1 Self-Contained Meter Sockets, 100 to 200 Amps
SS2 Current Transformer Meter Sockets Above 200 Amps SS3A Overhead Permanent Service, 200 Amps or Less, Periscope Mount SS3B Overhead Permanent Service, 200 Amps or Less, Gable Mount SS4 Overhead Service for Temporary Service & Trailers, 200 Amps or Less SS5 Temporary Underground Service SS6 Underground Service, 200 Amps or Less SS7 Undergound Service Remote & Trailers, 200 Amps or Less SS8 Undergound Service (6 units or less) SS8A Undergound Service (6 units or less), Option for Non-Residential SS9 Undergound Service (More than 6 units), up to 800 Amps (Single-Phase) SS10 Single-Phase up to 400 Amps, Three-Phase up to 600 Amps SS11 Underground Service, Three-Phase, up to 1400 Amps SS12 Underground Service, Three-Phase, up to 2000 Amps SS13 Combination Service, CT and Self-Contained Metering SS14 Underground Service to Load Centers, 200 Amps or Less SS15 Overhead Service for Load Centers, 200 Amps or Less SE-1 Residential Multi-Metering - 6 Meter Maximum SE-2 Wall-Mounted Pull Box with Terminal Bus SE-3 Combination Disconnect and Terminal Bus SE-4 Terminal Bus Details SE-5 Switchboard Style 201-4000 Amps SE-6 Switchboard - Self-Contained Meter SE-7 Switchboard - CT Metered SE-8 Commercial Load Center Padmounted SG-1 Typical Arrangement for Standby Generators, Alternatives 1 and 2 SG-2 Combination Service - CT and Self-Contained Metering SG-3 Service Guide Padmount Transformer Clearance SG-4 Metering and Service Entrance Equipment - Working Space and Clearance SG-5 Clearance For Residential Multiple Metering SG-6 Clearance For Switchboard Metering - Interior Mount SG-7 Conduit Guide
|